The Shimadzu QP 2010+ is under vacuum, initial parameters have been downloaded, and the GC is indicating Ready, but the MS is indicating Not Ready. How can I correct this?
Applies to: Chromatography QP2010 GCMS (GC/MS) | Tickets Solved: 0 | Rank: 34
MS Not Ready
- Once the instrument is able to reach the defined temperatures and flows in the method, the GC indicator will turn green and show Ready.
- In order for the MS indicator to turn green and show Ready, an auto-tune must be completed.
Contact technical support if further assistance is needed
Need more help with this instrument?
Our SMEs are standing by to assist with issues and repairs.
Was this helpful? Yes No
Keywords: auto-tune, indicator, ready, "not ready", MS